全国品茶信息资源整理平台,全国空降同城微信群,本地同城附近200元,全国大圈纯出外围招聘

Beijing Huayuan Thai Union Energy Saving Equipment Co.,Ltd.

Contact us

Contact Us

Tel:010-62701509
 010-82432231
Fax:010-62704977
Add:Yousheng Building C, 10-story, on the 20th of Chengfu Road, Haidian District, Beijing.

A district heating system with Co-generation


Background:

The contradiction that the district heating system with co-generation faces
1.There is a shortage of heat source, and the low-temperature surplus heat from CHP units is hard to be used. About 30% of the heat was discharged directly through cooling towers.
2.The transportation capacity of thermal network is not enough which is the problem of district heating. The construction of multi-pipe network costs a lot and demands time.

Process:


  
Instruction:

A complete absorption cycle consists of large-water-temperature-difference heating technology based on absorption cycle and the technology of recovery of surplus heat based on absorption cycle. The surplus heat recovery unit to recycle exhausted heat of condensate steam is installed in the first thermal station to solve the problem of heat source shortage. At the same time, the installation of absorption units with large water temperature difference that take the place of the original plate heat exchanger in the municipal thermal stations to reduce the temperature of the primary network return water and enlarge the temperature difference of the water of primary network so that it can improve the transportation ability of thermal network.

Technology advantages:
1.The temperature of primary network return water is reduced to 20℃.
2.The heating ability of CHP is increased by 30%.
3.The consumption of heat-supply is reduced by 40%.
4.The transportation capacity of pipe network is increased by 80%.

?
黄龙县ef7524| 吕梁市vqr524| 上高县t8g994| 凤冈县rbz906| 黄山市6dm740| 黎川县og6268| 平顶山市lkf756| 甘洛县rzj857| 肃宁县r6u281| 印江rvt701| 江孜县6bn740| 临西县gh7641| 兴宁市pqx903| 静安区nj7633| 金溪县vbg791| 通化市m5p482| 延寿县iaf666